Goshen Road South (P501107)

  • Category: Transportation
  • Sub Category: Roads
  • Administering Agency: Transportation (AAGE30)
  • Planning Area: Gaithersburg Vicinity
  • Date Last Modified: 4/21/14
  • Required Adequate Public Facility: No
  • Relocation Impact: None
  • Status: Preliminary Design Stage

EXPENDITURE SCHEDULE ($000s) 

FUNDING SCHEDULE ($000s)

Description

This project provides for the design of roadway improvements along Goshen Road from south of Girard Street to 1,000 feet North of Warfield Road, a distance of approximately 3.5 miles. The improvements will widen Goshen Road from the existing two-lane open section to a four-lane divided, closed section roadway using 12-foot inside lanes, 11-foot outside lanes, 18-foot median, and five-foot on-road bike lanes. A five-foot concrete sidewalk and an eight-foot bituminous hiker/biker path along the east and west side of the road, respectively, are also proposed along with storm drain improvements, street lighting and landscaping. The project also entails construction of approximately 6,000 linear feet of retaining wall.

Location

Goshen Road, Montgomery Village MD

Capacity

The Average Daily Traffic (ADT) on Goshen Road for the year 2025 is forecasted to be about 26,000.

Estimated Schedule

Final design is underway and will conclude in Fall 2014. Property acquisition will start in Winter 2015 and take approximately five years to complete. Due to fiscal capacity, utility relocations will start in Summer 2019 and construction will begin in Summer 2020; both activities will be completed in Spring 2022.

Justification 

This project is needed to reduce existing and future congestion and improve pedestrian and vehicular safety. Based on projected traffic volumes (year 2025), all intersections along Goshen Road will operate at an unacceptable level-of-service if the road remains in its current condition. The proposed project will provide congestion relief and create improved roadway network efficiency, provide for alternate modes of transportation, and will significantly improve pedestrian safety by constructing a sidewalk and a hiker/biker path. The Gaithersburg Vicinity Master Plan (January 1985; Amended May 1988; Amended July 1990) identifies Goshen Road as a major highway slated for improvement to 4-6 lanes.

Other

A more accurate cost estimate will be prepared upon the completion of final design. Expenditures beyond FY20 are as follows: FY21: $30,884,000 for construction and site improvements; FY22: $30,000,000 for construction and site improvements.

Fiscal Note

Expenditure schedule reflects fiscal capacity. Intergovernmental revenue is from the Washington Suburban Sanitary Commission (WSSC) for its agreed share of water and sewer relocation costs.

Disclosures

A pedestrian impact analysis has been completed for this project.

Coordination

Maryland-National Capital Park and Planning Commission, Maryland State Highway Administration, Utility Companies, Department of Permitting Services, City of Gaithersburg, Facility Planning: Transportation (CIP #509337)