Bridge Design (P509132)

  • Category: Transportation
  • Sub Category: Bridges
  • Administering Agency: Transportation (AAGE30)
  • Planning Area: Countywide
  • Date Last Modified: 12/23/13
  • Required Adequate Public Facility: No
  • Relocation Impact: None
  • Status: Ongoing

EXPENDITURE SCHEDULE ($000s) 

FUNDING SCHEDULE ($000s)

Description

This ongoing project provides studies for bridge projects under consideration for inclusion in the CIP. Bridge Design serves as a transition stage for a project between identification of need and its inclusion as a stand-alone construction project in the CIP. Prior to the establishment of a stand-alone project, the Department of Transportation will complete a design which outlines the general and specific features required on the project. Selected projects range in type, but typically consist of upgrading deficient bridges so that they can safely carry all legal loads which must be accommodated while providing a minimum of two travel lanes. Candidate projects currently included are listed below (Other).

Cost Change

Increase due to the addition of FY19 and FY20 to this on-going project and changes due to design schedule.

Justification 

There is continuing need for the development of accurate cost estimates and an exploration of alternatives for proposed projects. Bridge design costs for all projects which ultimately become stand-alone PDFs are included here. These costs will not be reflected in the resulting individual project. Future individual CIP projects which result from bridge design will each benefit from reduced planning and design costs. Biennial inspections performed since 1987 have consistently shown that the bridges currently included in the project for design studies are in need of major rehabilitation or replacement. Future individual CIP projects which result from bridge design will each benefit from reduced planning and design costs.

Other

Candidates for this program are identified through the County Biennial Bridge Inspection Program as being deficient, load restricted, or geometrically substandard. The Planning, Design, and Supervision costs for all bridge designs include all costs up to contract preparation. At that point, future costs and Federal aid will be included in stand-alone PDFs Candidate Projects: Elmhirst Parkway Bridge #MPK-13; Park Valley Road Bridge #MPK-O3; Piney Meetinghouse Road Bridge #M-0021; Whites Ferry Road Bridge #M-0187; Whites Ferry Road Bridge #M-0189; Valley Road Bridge #M-0111; Gold Mine Road Bridge #M-0096; Brink Road Bridge #M-0064; Garrett Park Road Bridge #M-0352; Beach Drive Bridge #MPK-24.

Disclosures

A pedestrian impact analysis has been completed for this project. Expenditures will continue indefinitely. The Executive asserts that this project conforms to the requirements of relevant local plans, as required by the Maryland Economic Growth, Resource Protection and Planning Act.

Coordination

Maryland-Department of the Environment, Maryland-Department of Natural Resources, Maryland-National Capital Park and Plannning Commission, Montgomery County Department of Permitting Services, U.S. Army Corps of Engineers, Maryland State Highway Administration, Federal Highway Administration, Utility Companies, Maryland Historic Trust, CSX Transportation, Washington Metropolitan Area Transit Authority, Rural/Rustic Roads Legislation